My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1243
>
2300 - Underground Storage Tank Program
>
PR0548639
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2024 10:04:08 AM
Creation date
9/14/2023 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548639
PE
2351
FACILITY_ID
FA0027823
FACILITY_NAME
ARCO AM/PM
STREET_NUMBER
1243
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95215
APN
10816016
CURRENT_STATUS
01
SITE_LOCATION
1243 W MARCH LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> E. UNDERGROUND STORAGE TANK(S): <br /> TANK#1 #2 #3 11 #4 #5 #6 <br /> CAPACITY 25,000 12,099 19,090 <br /> Containmentl Containment Containment <br /> MANUFACTURER Solutions I Solutions Solutions <br /> MODEL DWT-6 TYPE II DWT-6 TYPE II DWT-6 TYPE 1111 <br /> COMPOSITIONDM Fiberglass DM Fiberglass DM Fiberglass <br /> PRODUCT 87 Product 91 Product I Diesel Prod. <br /> Check Code <br /> Box Section <br /> �❑ 25290.1(c)(1) Tank(s) compatible with the substance to be stored. <br /> 25290.2(c)(1) <br /> 23 CCR** Design and construction of tank(s) and all other components used to construct primary <br /> ❑ 2631(b) containments stem(s) approved by independent testing organization (e.9� UL). <br /> 23 CCR <br /> ❑ 2631(a) Secondary Containment Provided for Underground Storage Tanks. <br /> �❑ Buoyancy Calculations submitted and signed by a Professional Engineer which <br /> demonstrates a safety factor greater than 1.25. <br /> F. SYSTEM PIPING: <br /> Primary <br /> PIPING MANUFACTURER MODEL COMPOSITION <br /> PRODUCT PIPING NOV Fiberglass Systm Red Thread 11A Fiberglass <br /> VAPOR PIPING NOV Fiberglass Sys tm Red Thread 11A I Fiberglass <br /> VENT PIPING NOV Fiberglass Systm-11 Red Thread 11A Fiberglass <br /> Secondary <br /> PIPING MANUFACTURER MODEL COMPOSITION <br /> PRODUCT PIPING NOV Fiberglass Systm Red Thread 11A Fiberglass <br /> VAPOR PIPING NOV Fiberglass Syst Red Thread 11A Fiberglass <br /> VENT PIPING I NOV Fiberglass Systm Red Thread 11A Fiberglass <br /> `HSC-Health and Safety Code <br /> 23 CCR-Code of California Regulations <br /> 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.