Laserfiche WebLink
Mcuutaln Hnu:.e spx lfr Planlll <br /> Also it Is possible that the Communily Park may be irrigated by non potable water from BRIO.further <br /> reducing the SP 111 potable water requirements_A pump station and underground pipeline from existing <br /> 3H 113 canal faoifties at the County Ilne will need to he Installed in Grant LI no Road easterly to Central <br /> Parkway.thence south in Central Parkway to the Delta College and Community Park sites(see figure <br /> 12-2: PctaDle Water Distribution System (Preliminary))_ The non-potable water demand for Delta <br /> College is projected to be approximately 175 acne•teetlyear.For the 30.520.0 acre Community Park, <br /> the annual demand for full non-potable water use Is approxirrlately 0980 acre-feet,The existing water <br /> supply agreement between GRID and MHOS❑ would require amendment to seoure the additional <br /> supply needed to serve the Community Park with non-potable water, <br /> 12.3.3 Implementation Measures <br /> Water Demand (MP). Water demand Is estimated per the values presented In Table 12-1: Water <br /> Demand for Speolfic Plan ill. <br /> ..........................................I.................,.............................................................................................................. <br /> Revised OClober 18r 2022 42.5 <br /> Resolution Template 01/2023 <br />