Laserfiche WebLink
Mminialn House Specliflo Plan Hl <br /> ....................... ....................—.................................... ................................. .......... .............. ............... <br /> Other public facilities that are not located within SP III but have been constructed in part to serve SP <br /> Ill. such as the water and wastewater treatment plants and associated pipes and facilities, will be <br /> constructed in part with funds from SP Ill through payments to the MHCSD. <br /> Details of the costs of infrastructure and public facilities necessary for SP 41 are presented in Table <br /> 16-2- Uses of Funds for Capital Improvements and Public Faallitles. These costs are currently <br /> estimated to total$125.5 million The costs include: <br /> 41 Roads <br /> A Community Parks <br /> Regional Park <br /> • Open Space Corridors <br /> • Utility Transmission Fa cilifies,such as water,wastewater and storm water lines <br /> The majority of public infrastructure improvements will he financed through private IN na n cing obtained <br /> by developers and landowners at SP Ill and assessment bonds or other public finance secured by <br /> property tax revenue. Some facilities,such as utility infrastructure,will be constructed with funds from <br /> the utility provider,wh1ch in turn are financed through connection charges,deveiopmentfees.and rates <br /> charged to end users. Some capital fecilitles have also been constructed by the MHGSI). Table 16- <br /> 3:Sources of runds for Capital improvements and Public Facilities,summarizes the sources of funds <br /> anticipated for the capital improvements detailed in the Specific Plan,which total$125.5 million, Thu <br /> bulk of the funding, approximately $64.2 million, will come from private firianoing. An addluonal <br /> signillca nt source of funding wi 11 be fees collected for traffic mitigation and Infrastructure co nstructed <br /> elsewhere at Mountain House,as shown on Table 16-3: Sources of Funds for Capital Improvements <br /> wid Public Facilitles. As the financing plan is developed and the details of public financing <br /> mechanisms finalized, an additional analysis will be conducted to ensure that the total fees, <br /> assessments and taxes on the project do not render the project economically Infeasible, <br /> 16.2.21 Schools <br /> At-fetal-of twoQ_IL9 In Lsere K-8 so In oois.is.Bre designated riated within SIP 11 I.,4, >etl44f+-Ne10 h-b0fbq3-0d-N& -F <br /> schools will be owned and operated by the Larnmersville Unified Oementa School District <br /> (ILGLU S D). A high school will be constructed In Neighborhood D outside the SP III boundary. The <br /> %4 school will be owned and operated by the T4aGy LIN ed School irWrALUSU. Rinding and <br /> provision of school altos,facilities and services shall malintain pace with development and enrollment <br /> an a neighborhood basis according to the school funding agreements betweeii the school districts <br /> and the davalopers within SP 111. TI m I ng requirarnant:5 far phe sad provision of now school fad I ties <br /> shall be fled to residential developments enrollment experienced,and projected enrollment equaling <br /> a percentage of the ultimate school design capacity as approved by the School District. Phased <br /> permanent core facilfles and classrooms may also be supplemented by relocatable classrooms <br /> according to State and School District standards and needs. <br /> 'Gii�;...................................................................... a.................................................................................. <br /> Resolution Template 01/2023 <br />