Laserfiche WebLink
FINDINGS FOR ADMINISTRATIVE USE PERMIT <br /> PA- 2300151 <br /> SEAN & SAM INC . / SAC WIRELESS <br /> 1 . The proposed use is consistent with the goals , policies , standards , and maps of the General Plan , any <br /> applicable Master Plan , Special Purpose Plan , Specific Plan , and Planned Development zone ; and any <br /> other applicable plan adopted by the County . <br /> • This finding can be made because the proposed Telecommunications Tower and <br /> ancillary equipment may be conditionally permitted in the AG - 40 ( General Agriculture , <br /> 40 acre minimum ) zone with an approved Administrative Use Permit application . The <br /> proiect site has a General Plan designation of A / G ( Agriculture General ) , and the AG - 40 <br /> zone is an implementing zone for this designation . Therefore , the proposed <br /> Telecommunication Tower is consistent with the goals , policies , standards and maps of <br /> the General Plan , and there are no Master Plans , Specific Plans , and / or Special Purpose <br /> Plans in the project vicinity . <br /> 2 . Adequate utilities , roadway improvements , sanitation , water supply , drainage , and other necessary <br /> facilities have been provided , and the proposed improvements are properly related to existing and <br /> proposed roadways . <br /> • This finding can be made because there are no new utility or roadway improvements <br /> required . A Telecommunications Tower is an unmanned facility and will not impact <br /> existing public utilities . This project will not require the use of public water , or a septic <br /> system and all storm water will be retained on site . The proposed project will be <br /> accessed from West Durham Ferry Road . <br /> 3 . The site is physically suitable for the type of development and for the intensity of development . <br /> • This finding can be made because the 42 . 3 & acre project site is of adequate size to <br /> accommodate the proposed use and the Site Plan shows that all setbacks , and other <br /> requirements of the Development Title can be met . <br /> 4 . The location , size , design , and operating characteristics of the proposed use will be compatible with <br /> and will not adversely affect the livability or appropriate development of abutting properties and the <br /> surrounding neighborhood . <br /> • This finding can be made because the proposed Telecommunications Tower <br /> encompasses a small area and is exempt from environmental review . The proposed <br /> project is a compatible use in the AG - 40 zone and is not anticipated to adversely affect <br /> the livability or appropriate development of abutting properties and the surrounding <br /> neighborhood . <br /> 5 . The proposed use will not create any nuisances arising from the emission of odor , dust , gas , noise , <br /> vibration , smoke , heat , or glare at a level exceeding ambient conditions . <br /> • This finding can be made because the proposed use is not anticipated to create any <br /> nuisances related to the emission of odor , dust , gas , noise , vibration , smoke , heat or <br /> glare at a level exceeding ambient conditions with the inclusion of the proposed <br /> Conditions of Approval . Requirements from the Planning Division and Building Division <br /> will address noise , vibration , and glare , while the County Fire Division has provided <br /> conditions to prevent smoke and heat . Additionally , the Department of Public Works , <br /> Environmental Health Department , and the San Joaquin Council of Governments will <br /> ensure that the project is developed to the appropriate standards to avoid creating a <br /> nuisance . <br /> PA - 2300151 — Findings 1 <br />