Laserfiche WebLink
/~-r ' ---''- -- ---'- - ''- - -- <br /> < Mitigation Measure <br /> Method of Verification Party Verification <br /> Monitoring Party <br /> Unpaved Road Speeds:The <br /> construction contractor shall <br /> limit traffic speeds on unpaved <br /> roads to 16 mph. <br /> Erosion Control: The <br /> construction contractor shall <br /> install gravelbags or other <br /> erosion-control measures to <br /> prevent silt runoff to public <br /> roadways- ..from sites with - <br /> slope greater than 1 percent <br /> during ground-disturbing <br /> Wind Breaks:The construction <br /> | <br /> maintain wind breaks ak <br /> | windward side(s)of <br /> construction areas throughout <br /> construction activities. <br /> High Winds:The construction <br /> contractor shall suspend <br /> ! °^ grading ' <br /> - | <br /> when =" °�°�e="="miles <br /> per hour. <br /> ` ismuznomEqm0o/oent <br /> off-road construction equipment <br /> used within project area shall conform <br /> to the United States Environmental <br /> Protection Agency's Tier 3 or higher <br /> emissions standards.The construction <br /> contractor shall be made <br /> aware of this requirement prior to the <br /> start of construction activities. Use of <br /> I Tier 3 or higher off-road construction <br /> i equipment shall be stated on all <br /> grading plans.The construction <br /> contractor shall maintain a list of all <br /> operating equipment in use on the <br /> project site.The construction <br /> equipment list shall state the makes, <br /> models,and numbers of construction <br /> equipment onsite and shall be made <br /> available, upon request,to the San <br /> 1 Joaquin Valley Air Pollution Control <br /> The construction contractor shall <br /> / <br /> � <br /> \~ <br /> ` <br /> Conditions of Approval - 13- PA,0800005 <br />