My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
COMPLIANCE INFO_2023 RPT OF FACILITY INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 1:28:51 PM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 RPT OF FACILITY INFO
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/~-r ' ---''- -- ---'- - ''- - -- <br /> < Mitigation Measure <br /> Method of Verification Party Verification <br /> Monitoring Party <br /> Unpaved Road Speeds:The <br /> construction contractor shall <br /> limit traffic speeds on unpaved <br /> roads to 16 mph. <br /> Erosion Control: The <br /> construction contractor shall <br /> install gravelbags or other <br /> erosion-control measures to <br /> prevent silt runoff to public <br /> roadways- ..from sites with - <br /> slope greater than 1 percent <br /> during ground-disturbing <br /> Wind Breaks:The construction <br /> | <br /> maintain wind breaks ak <br /> | windward side(s)of <br /> construction areas throughout <br /> construction activities. <br /> High Winds:The construction <br /> contractor shall suspend <br /> ! °^ grading ' <br /> - | <br /> when =" °�°�e="="miles <br /> per hour. <br /> ` ismuznomEqm0o/oent <br /> off-road construction equipment <br /> used within project area shall conform <br /> to the United States Environmental <br /> Protection Agency's Tier 3 or higher <br /> emissions standards.The construction <br /> contractor shall be made <br /> aware of this requirement prior to the <br /> start of construction activities. Use of <br /> I Tier 3 or higher off-road construction <br /> i equipment shall be stated on all <br /> grading plans.The construction <br /> contractor shall maintain a list of all <br /> operating equipment in use on the <br /> project site.The construction <br /> equipment list shall state the makes, <br /> models,and numbers of construction <br /> equipment onsite and shall be made <br /> available, upon request,to the San <br /> 1 Joaquin Valley Air Pollution Control <br /> The construction contractor shall <br /> / <br /> � <br /> \~ <br /> ` <br /> Conditions of Approval - 13- PA,0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.