Laserfiche WebLink
Mitigation Measure Implementing s Timing of <br /> Verification Monitoring Party <br /> Method of Verification Party <br /> .......... <br /> Impact Minimization Plan,as <br /> required under CCR Title 14,for its <br /> composting operations,which is <br /> regulated by the LEA,and includes <br /> an array of best management <br /> practices and odor mitigation <br /> ► measures,including: <br /> o limited holding times <br /> for composting <br /> feedstocks; <br /> o a covered,aerated <br /> system for composting <br /> of food materials; <br /> o suspension of <br /> materials handling <br /> during high wind <br /> events; <br /> o use of deodorants to <br /> mask or neutralize <br /> odors as needed; <br /> proper maintenance of site pavement <br /> and structural drainage elements, <br /> including treatment of process water; <br /> use of proper composting techniques <br /> feedstock blending,pile construction <br /> -,d maintenance. <br /> Conditions of Approval - 15- PA-0800005 <br />