Laserfiche WebLink
This communication(including any attachments)may contain privileged or confidential information intended for a <br /> specific individual and purpose,and is protected by law.If you are not the intended recipient,you should delete this <br /> communication and/or shred the materials and any attachments and are hereby notified that any disclosure, copying, <br /> or distribution of this communication,or the taking of any action based on it,is strictly prohibited. <br /> Thank you. <br /> From: Backus, Garrett [EHD] <gbackus@slgov.org> <br /> Sent: Friday,June 23, 2023 12:16 PM <br /> To: Neil Edgar<neil@edgarinc.org> <br /> Cc:Scott Stortroen <scotts@tdswm.com>; Mike Repetto<MikeR@tdswm.com> <br /> Subject: RE:Tracy Material Recovery&Transfer Facility-5-Year Permit Review <br /> Hi Neil, <br /> The food waste processing language looks good but needs to be converted from "proposed"to the <br /> actual operation and specific location. SB-1383 measurements of the residual contaminates left in the <br /> processed food (17409.5.4) and the residual organics left in the contaminates (17409.5.5) need to be <br /> added. Also add where the source separated processed food waste will go next. The RCSI states on <br /> page 8 that co-collected food waste will be composted at maximum of 15%co-collected food with green <br /> waste. Source separated food waste can be composted at 40%food using static pile. The site does not <br /> currently have a static pile system set up. Will any of the processed food waste be shipped off site to <br /> another composter? <br /> Please also submit another E-177 with the RFI amendment box checked. <br /> Garrett <br /> From: Neil Edgar<neil@edgarinc.org> <br /> Sent:Thursday,June 22, 2023 3:47 PM <br /> To: Backus, Garrett [EHD] <gbackus@sigov.org> <br /> Cc: Scott Stortroen <scotts@tdswm.com>; Mike Repetto<MikeR@tdswm.com> <br /> Subject: RE:Tracy Material Recovery&Transfer Facility-5-Year Permit Review <br /> Garrett— <br /> I appreciate the comments and will work to complete the revision by your July 25 deadline, once I return <br /> from vacation on July 5. <br /> 1 note that your comment#3 is regarding the food processing equipment that is located in the MRF <br /> Building. I am hoping that you might be able to provide more detailed information about what revisions <br /> to the RFI are needed in that regard. Below is the current language, starting on page 12, which <br /> anticipated the installation and utilization of this equipment: <br /> Food Waste Processing <br /> The food waste processing equipment would be located inside the Material Recovery Facility or <br /> a stand-alone building onsite. The proposed building would be permitted and constructed with an <br /> air handling system, water source, and appropriate drainage control; the LEA would be notified of <br /> the proposed location prior to construction. The proposed equipment for the facility includes a <br /> hopper, sort line conveyor, sort line grinder feed conveyor, hammer mill grinder, grinder discharge <br /> conveyor and stacking conveyor for loading a truck or bins to transport separated food waste to <br /> a compost or anaerobic digestion facility. <br /> Source separated food waste from commercial, industrial, or residential locations would be <br /> delivered to the indoor food waste processing area where it would be tipped directly into the <br /> 8 <br />