My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 3:49:45 PM
Creation date
11/1/2023 4:25:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer M Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure M Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Gauge <br /> Tank ID 87-1 Annular 87-2 Annular 91 Annular <br /> Tank Manufacturer Unknown Unknown Unknown <br /> Tank Capacity 12000 Gal 12000 Gal 12000n Gal <br /> Test Start Time 9:10 AM 9:30 AM 9:50 AM <br /> Initial Reading 7 HG 7 HG 7 HG <br /> Test End Time 10:10 AM 10:30 AM 10:50 AM <br /> Final Reading 7 HG 7 HG 7 HG <br /> Change in Reading 0 HG 0 HG 0 HG <br /> Pass/Fail Criteria 0 HG 0 HG 0 HG <br /> Tightness Test Results M Pass ❑ Fail M Pass ❑ Fail I M Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer M Industry Standard ❑ Professional Engineer <br /> Test Type M Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Pipe Run ID 87-1 Product 87-2 Product 91 Product <br /> Pipe Manufacturer AO Smith AO Smith AO Smith <br /> Test Start Time 8:50 AM 8:50 AM 8:50 AM <br /> Initial Reading 5 PSI 5 PSI 5 PSI <br /> Test End Time 9:50 AM 9:50 AM 9:50 AM <br /> Final Reading 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Criteria 0 PSI 0 PSI 0 PSI <br /> Tightness Test Results M Pass ❑ Fail M Pass ❑ Fail M Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID 87-1 Vent 87-2 Vent 91 Vent Vapor Return <br /> Pipe Manufacturer AO Smith AO Smith AO Smith AO Smith <br /> Test Start Time 8:55 AM 8:55 AM 8:55 AM 8:55 AM <br /> Initial Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time 9:55 AM 9:55 AM 9:55 AM 9:55 AM <br /> Final Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 PSI 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Criteria 0 PSI 0 PSI 0 PSI 0 PSI <br /> Tightness Test Results M Pass ❑ Fail M Pass ❑ Fail M Pass ❑ Fail M Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.