My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 ARCADIS REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_2023 ARCADIS REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:25:53 AM
Creation date
11/22/2023 8:56:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 ARCADIS REPORT
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Safety Analysis <br /> General <br /> JSA ID 44 Status (3)Completed <br /> Job Name Environment-Drilling,soil sampling,well Created Date 2/4/2009 <br /> installation <br /> Task Description Drilling,soil sampling,and well installation Completed Date 02/04/2009 <br /> Template True Auto Closed False <br /> Client/Project <br /> Client ARCADIS-AGMI <br /> Project Number 000000100000 <br /> Project Name GENERAL OVERHEAD <br /> PIC <br /> Project Manager <br /> User Roles <br /> Role Employee Due Date Completed Date Supervisor Active <br /> Developer Coppola, Mija A 6/28/2012 2/4/2009 Ebert,Joachim ❑ <br /> HASP Reviewer Coppola, Mija A 2/6/2009 2/2/2009 Ebert,Joachim ❑ <br /> Job Steps <br /> .. Step No. Job Step Description Potential Hazard Critical Action H&S Reference <br /> 1 Set up necessary traffic and 1 Struck by vehicle due to Use a buddy system for placing site control <br /> public access controls improper traffic controls cones and/or signage.Position vehicle so <br /> that you are protected from moving traffic. <br /> Wear Class I I traffic vest <br /> 2 Utility Clearance 1 Potential to encounter Complete utility clearance in accordance with ARCADIS H&S <br /> underground or above the ARCADIS Utility Clearance H&S Standard <br /> ground utilities while drilling. Standard. ARCHSFS019 <br /> 3 General drill rig operation 1 Excessive noise is When the engine is used at high RPMs or <br /> generated by rig operation. soil samples are being collected,use hearing <br /> protection. <br /> 2 During drill rig operation, Due to friction and lack of a drilling fluid,heat <br /> surfaces will become hot and will be produced during this method.Mainly <br /> cause burns if touched,and drill augers.Be careful handling split spoons. <br /> COCs in the soils more Wear proper work gloves.When soils and <br /> readily vaporize generating parts become heated,the COC could <br /> airborne contaminates. volatilize.Air monitoring should always be <br /> performed in accordance with the HASP. <br /> 3 Moving parts of the drilling Stay at least 5 feet away from moving parts <br /> rig can pull you in causing of the drill rig.Know where the kill switch is, <br /> injury.Pinch points on the rig and have the drillers test it to verify that it is <br /> and auger connections can working. Do not wear loose clothing,and tie <br /> cause pinching or crushing long hair back.Avoid wearing jewelry while <br /> of body parts. drilling.Cone off the work area to keep <br /> general public away from the drilling rig. <br /> 4 Dust and debris can cause Wear safety glasses and stay as far away <br /> eye injury and soil cuttings from actual drilling operation as practicable. <br /> and/or water could contain Wear appropriate gloves to protect from <br /> COCs. COCs. <br /> 5 Drilling equipment laying on Keep equipment and trash picked up,and <br /> the ground(i.e.augers,split store away from the primary work area. <br /> spoons,decon equipment, <br /> coolers,etc),create a <br /> tripping hazard.Water from <br /> decon buckets generate mud <br /> and cause a slipping hazard. <br /> 6 The raised derrick can strike Never move the rig with the derrick up. <br /> overhead utilities,tree limbs Ensure there is proper clearance to raise the <br /> or other elevated items derrick,and that you are far enough away <br /> from overhead power lines.See the <br /> Utility Clearance H&S Standard for guidance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.