Laserfiche WebLink
4 Mudd rotary drilling 1 The raised derrick can strike Never move the rig with the derrick up. <br /> overhead utilities,tree limbs Ensure there is proper clearance to raise the <br /> or other elevated items. derrick,and that you are far enough away <br /> from overhead power lines.See the Utility <br /> Location H&S policy and procedure for <br /> guidance. <br /> 2 This technology uses fluid, Wear rubber boots if needed,and keep clear <br /> which collects with of muddy/wet area as much as practicable. If <br /> sediments in large basin. area becomes excessively muddy,consider <br /> Fluid can splash out and mud spikes or covering the area with a <br /> cause slipping/mud hazard. material that improves traction.Wear safety <br /> Liquid mixture can splash glasses. <br /> into your eyes. <br /> 5 Hollow stem auger drilling 1 All hazards in step 3 apply. Never move the rig with the derrick up. <br /> Additionally,The raised Ensure there is proper clearance to raise the <br /> derrick can strike overhead derrick,and that you are far enough away <br /> utilities,tree limbs or other from overhead power lines.See the Utility <br /> elevated items Location H&S policy and procedure for <br /> guidance. <br /> 2 Hands or fingers can get Auger should always be stopped and clutch <br /> caught and crushed if trying disengaged prior to cleaning. <br /> to clean by hand or with <br /> tools while the auger is still <br /> turning. <br /> 6 Air Rotary Drilling 1 This drilling method works When the drill rig is being driven into media, <br /> with high air pressure and it will produce flying debris.The flaps behind <br /> can generate flying debris the drill rig should stay closed whenever <br /> that can strike your body or possible to reduce the risk of flying debris. <br /> get in your eyes. Safety glasses and hard hat should always <br /> be worn when the drill rig is operating.When <br /> penetrating asphalt,protect surrounding cars <br /> that may be present to avoid damage to pain <br /> or windshields. <br /> 2 The raise derrick can strike Never move this rig with the derrick up. <br /> overhead utilities,tree limbs Ensure there is proper clearance to raise the <br /> or other elevated items. derrick and that you are far enough away <br /> from overhead power lines.See the Utility <br /> clearance H&S Standard for guidance. <br /> 3 When drilling through Supplemental water should be used to <br /> bedrock prior to manage dust and/or dust masks should be <br /> groundwater,dust can be used if necessary. <br /> produced from pulverization. <br /> Inhalation of dusts/powder <br /> can occur. <br /> 7 Reverse rotary drilling 1 This method will use fresh Ensure the pit construction can hold the <br /> water to pump out drill amount of cuttings that are anticipated.Air <br /> cuttings through the center monitoring should also be used of pit area. <br /> of the casing. <br /> Water/sediment mixture is <br /> generated and could cause <br /> contact with impacted soils <br /> or groundwater. <br /> 2 Fire hydrants are often used Water usage from fire hydrants should be <br /> for water source.Hydrants cleared with local municipalities prior to use. <br /> deliver water at high Only persons that know how to use the <br /> pressure.Pressurized water hydrant should be performing this task. <br /> can cause flying parts/debris Ensure all connections are tight,and hose <br /> and excessive slipping line is not run over to cut by traffic.Any leaks <br /> hazards. from the hydrant should be reported <br /> immediately. <br /> 3 Settling pit construction can Cone off the area to keep the general <br /> cause tripping hazard from public/visitors away from the settling pit. <br /> excavated soils,and plastic Ensure proper sloping of excavation. <br /> sheeting can cause slipping. <br /> 4 The raised derrick can strike Never move the rig with the derrick up. <br /> overhead utilities,tree limbs Ensure there is proper clearance to raise the <br /> or other elevated items. derrick,and that you are far enough away <br /> from overhead power lines.See the Utility <br /> Location H&S policy and procedure for <br /> guidance. <br />