Laserfiche WebLink
3 Installation of hand auger 4 Fatigue can occur due to Take rest breaks as needed or switch out <br /> boring strenuous nature of hand task with another employee. <br /> augering activities <br /> 4 Collect Sample Soil Sample 1 Staff can come into contact Wear chemical protective gloves as outlined <br /> with impacted soils in the HASP,and wear safety glasses. <br /> 2 Sharp edges and broken Discard any broken sample containers or <br /> glassware can cause glass. Do not overtighten sample containers. <br /> lacerations <br /> 3 Containerizing and moving Dispose of left over soil cuttings in a drum or <br /> soil cuttings can cause bucket and dispose properly.Only fill buckets <br /> muscle strains half full due to weight and strength of bucket. <br /> Wear leather work gloves and use good <br /> lifting techniques when handling buckets. <br /> 5 Decon Hand Auger 1 Exposure to CDCs while Wear chemical protective gloves as outlined <br /> deconing equipment. in the HASP,and wear safety glasses. <br /> 2 Cleaning solutions can Use PPE as outlined in the HASP,and try to <br /> splash while deconing minimize splashing. <br /> equipment <br /> 3 The end of the hand auger Use brush to scrub off soils and not hands. <br /> has sharp edges,and Do not reach into the nose(the end with <br /> lacerations can occur teeth)of the auger with hand. <br /> 6 Fill in Sample Location 1 Open boreholes are a trip Fill in hole with sand or bentonite.Pack down <br /> hazard chips as best as possible.Add a bit of DI <br /> Water to make chips swell and fill hole <br /> completely. <br /> 2 Muscle strain can occur from Use proper lifting techniques as detailed in <br /> lifting bags of sand and/or the Field H&S handbook <br /> bentonite. <br /> 7 Installation of Temporary 1 Excessive noise can occur Wear hearing protection. see Concrete work <br /> Piezometer/Well form driving well casing with JSA <br /> hammer or macrocore <br /> sampler. <br /> 2 Body parts or onlookers can Check swing radius above and around before <br /> be struck when using hand driving well casing in bore hole.Wear leather <br /> tools gloves and safety glasses. <br /> 3 Muscle strains can occur Stretch out arms/back/shoulder muscles prior <br /> when pulling/pushing well to beginning.Take frequent breaks as fatigue <br /> materials into place sets in and if muscle cramps occur. <br /> 4 Edges of PVC well casings File the tops of well casings after they have <br /> have sharp edges especially been cut.Wear leather work gloves. <br /> when they have been cut, <br /> which can cause lacerations. <br /> 5 Debris in the eyes can occur Use disposable dust mask if excessive dust <br /> when working with soil, is created. <br /> grout,and bentonite <br /> PPE Personal Protective Equipment <br /> Type Personal Protective Equipment Description Required <br /> Eye Protection safety glasses Required <br /> Foot Protection steel-toe boots —� Required <br /> Hand Protection chemical resistant gloves(specify type) Required <br /> work gloves(specify type) Required <br /> Head Protection hard hat Required <br /> Hearing Protection ear plugs Required <br /> Miscellaneous PPE traffic vest--Class II or III Required <br /> Respiratory Protection dust mask Recommended <br /> Supplies <br /> SupplyType <br /> Decontamination Decon supplies(specify type) Required <br /> Miscellaneous first aid kit Required <br /> Personal eye wash(specify type) bottle Required <br /> Traffic Control traffic cones Required <br />