Laserfiche WebLink
Review Comments <br /> Reviewer Comments <br /> Employee: Coppola,Mija A <br /> Role HASP Reviewer <br /> Review Type Approve <br /> Completed Date 2/6/2009 <br /> Employee: Vollertsen,Patricia A Looks really good and these are so easy to read.Some comments Step 1,hazard 2:Consider <br /> Role Quality Reviewer including page number from handbook Step 2,hazard 2:Consider using"hand/muslce fatigue <br /> Review Type NA rather than"strain".Step 3,critical action 1: Is Tyvek ever required for really wet soils?Step 3, <br /> Completed Date 3/3/2009 harard 3 and step 5 hazard 1:Consider muscle"fatigue"rather than strain Step 5,hazard 1: Do you <br /> ever have to move to the next spot before filling in hole?If so,may want to add in the CA-if you <br /> have to walk away before filling,mark hole to alert others.Step 6-as this is a JLA for hand <br /> augering,would you maybe just reference the"well installation JLA"rather than adding the step <br /> here?If that doesn't make sense,need to look at hazard 5 as it notes that debris can get in eyes, <br /> but the CA talks about a dust mask-may want to reword that debris in eyes,nose and mouth can <br /> occur when working with soil,grout,and bentonite and for CA include reference to eye protection. <br />