Laserfiche WebLink
DRAFT [TENTATIVE] MONITORING & REPORTING PROGRAM R5-2023-XXXX 35 <br />FORWARD, INC. <br />FORWARD LANDFILL <br />SAN JOAQUIN COUNTY <br />Constituent Parameter GeoTracker <br />Code <br />Units Sampling <br />Freq. <br />Reporting Freq. <br />Short List VOCs <br />(Attachment A) <br />(various)µg/L (same)(same) <br />Dissolved Inorganics <br />(Attachment B) <br />(various)µg/L (same)(same) <br />1,2,3-Trichloropropane per <br />Method SRL-524M-TCP <br />TCPR123 µg/L (same)(same) <br />See Glossary for definitions of terms and abbreviations in table. <br />3. Cannery Waste Land Application <br />a. Soil Sampling— The Discharger shall collect representative soil <br />samples from the land application areas at the beginning and end <br />of each cannery season (documentation of exact location and <br />depth shall be recorded) and daily wet weight and weekly <br />composite waste samples from each cannery waste source. The <br />Cannery Wastewater Quality Protection Standard was last updated <br />with data collected in the third quarter 2021 Annual Water Quality <br />Monitoring Report (see section E.9). The soil and composite waste <br />samples shall be analyzed for biochemical oxygen demand (BOD), <br />total dissolved solids, total nitrogen, total Kjeldahl Nitrogen (TKN), <br />nitrate, nitrite, iron, arsenic, and manganese. In addition, the weekly <br />total mass of nitrogen applied per acre shall be calculated and <br />reported in the Quarterly Reports. A crop type sufficient to uptake <br />100% of the nitrogen must be planted, grown and harvested, <br />following the cropping methodologies of the latest Nutrient <br />Management Plan. The annual total nitrogen load shall not exceed <br />300 pounds per acre, unless a site specific loading rate is <br />established by a Nutrient Management Plan approved by the <br />Executive Officer. An annual land application monitoring summary <br />shall be reported in the Annual Report (see section E.2). In <br />addition, the following monitoring shall be conducted: <br />i. Inspection— Land application areas shall be inspected prior <br />to discharge of putrescible cannery solids and non- <br />putrescible rinsate/wastewater, and observations from those <br />inspections shall be summarized for inclusion in the quarterly <br />monitoring reports. The following items shall be noted in <br />daily pre-application inspections: