My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 1 EARTHWORK <br /> SECTION 02300 EARTHWORK PART 1 GENERAL 1.1 WORK INCLUDED A. This section covers the Work necessary to construct the earthwork for Waste Management Unit (WMU) FU-23 at the Forward Landfill. Specifically, it includes, but is not limited to, excavation, general earthfill, and grading; connection to adjacent waste management units, construction of a compacted clay liner, construction of a granular drainage layer, construction of a protective operations layer, construction of LCRS trenches, excavation and backfilling of anchor trenches, construction of liner termination and anchor berms, and construction of a lysimeter. Miscellaneous minor earthwork may also be required, as directed by the OWNER. 1.2 DEFINITIONS A. Acceptance Testing: Tests performed by the QA/QC CONSULTANT to verify the in-place properties of constructed components. B. Completed Course: The completed course is defined as a course or layer that is ready for the next layer or the next phase of construction. C. Construction Quality Assurance (CQA) Manual: A program of activities that will provide adequate confidence that materials and workmanship meet the requirements of the Contract and fulfill the project objectives. CQA includes quality acceptance tests and procedures that are outlined in the CQA Manual. The CQA Manual is an attachment to these Contract Documents. D. DESIGN ENGINEER: LEWIS ENGINEERING E. EARTHWORK CONTRACTOR: The entity that will perform all earthwork as required by these Specifications. F. Imported Material: Material obtained by the CONTRACTOR or OWNER from offsite sources. G. OWNER: Forward, Inc. H. QA/QC CONSULTANT: Consulting engineering firm directing, coordinating, or providing subsurface soil investigations, soil testing laboratory, geosynthetics testing laboratory, monitoring of construction, and construction surveillance. The QA/QC CONSULTANT is technically accountable to Forward, Inc. and responsible for certification of construction according to the specifications outlined herein. The QA/QC CONSULTANT consists of the CQA Officer and CQA Inspection Personnel. The CQA Officer has final authority on decisions to be made by the CQA Inspection Personnel. I. Subgrade: Surface upon which fills or other features, including geosynthetics, are to be constructed. J. Unclassified: The nature of materials to be encountered has not been identified or
The URL can be used to link to this page
Your browser does not support the video tag.