My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 15 EARTHWORK <br /> 3. The minimum final thickness of the clay liner shall be as shown on the <br />Construction Drawings. <br /> 4. Moisture conditioning shall be uniform throughout each lift. Use tilling, <br />discing, or other options to thoroughly mix soil and water. If underlying <br />lifts are allowed to dry out, they shall be reconditioned and recompacted <br />prior to placement of new liner material. <br /> 5. The clay liner shall be compacted in-place to a minimum dry density of <br />93 percent relative compaction at a water content of 3 to 5 percent greater <br />than the optimum water content as measured by ASTM D1557. <br /> 6. Scarify surface of each lift to a depth of 2 inches prior to placing the <br />subsequent lift of Clay Liner Material. <br /> 7. Clay Liner Material shall not be placed at a high water content so that <br />excessive cracking occurs when the layer dries out. <br /> 8. Clay liner soil shall be sufficiently blended and compacted to provide a <br />homogeneous clay liner sufficient to meet required permeability. <br /> 9. The top surface of the final lift shall be bladed smooth and recompacted <br />with a non-vibratory steel drum roller to produce a smooth top surface free <br />from tire or roller marks, holes, and depressions more than 1/2 inch deep. <br />The top surface shall conform to the lines and grades shown on the <br />Construction Drawings. <br /> 10. At the end of each construction day's activities, completed lifts or sections <br />of compacted clay liner shall be sealed by rolling with a rubber tired, or <br />smooth drum, rollers and sprinkled with water as needed. <br /> 11. Upon completion of the clay liner, the GEOSYNTHETICS <br />CONTRACTOR shall place geomembrane lining as specified in <br />Section 02778, HIGH DENSITY POLYETHYLENE (HDPE) <br />GEOMEMBRANE. The OWNER shall survey the termination edges of the <br />HDPE Geomembrane at a minimum 50-foot interval. <br /> 12. Prepare the top surface of the clay liner for placement of the geomembrane <br />liner by removing rock, debris, cracks, or other structural irregularities that <br />could puncture or cause undue stress on the geomembrane liner. The top <br />surface will be inspected and approved by the QA/QC CONSULTANT and <br />the GEOSYNTHETICS CONTRACTOR prior to placement of the <br />geomembrane lining. <br /> 13. All corners/edges of the finished clay liner shall be rounded in preparation <br />for geomembrane lining installation. <br /> <br /> D. Moisture Control <br /> <br /> 1. During compacting operations, maintain water content in each lift of the <br />Clay Liner Material within range of 3 to 5 percent greater than the optimum <br />water content. <br /> 2. If Clay Liner Material is too dry, add water to material by sprinkling, then <br />mixing or discing to make moisture content uniform throughout lift. <br /> 3. Do not attempt to compact Clay Liner Material that contains excessive <br />moisture. Aerate material by blading, discing, harrowing, or other methods, <br />to hasten drying process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.