<br /> <br /> Forward Landfill WMU FU-23 02300 14 EARTHWORK <br />Forward Landfill. The EARTHWORK CONTRACTOR shall determine <br />construction procedures to be used, subject to the approval and acceptance <br />testing by the QA/QC CONSULTANT. <br /> 2. The EARTHWORK CONTRACTOR shall process the Clay Liner Material <br />suitable for the purpose intended. After processing, the Clay Liner Material <br />shall be free from dry clods, roots, organic matter, frozen material, debris, <br />rocks or stones larger than 1 inch, and other deleterious material. Clay <br />Liner Material shall be thoroughly blended and compacted to provide a <br />homogeneous material relatively uniform in gradation and moisture content. <br /> 3. The Clay Liner Material shall be as uniform as possible, free of penetrating <br />cracks, and having inter-lift boundaries completely blended. The soil shall <br />be kneaded by multiple passes with a heavy-weight footed compactor to <br />produce a soil structure having low hydraulic conductivity, and not simply <br />achieving a relative compaction goal. The top surface shall be smooth, <br />graded to the grades shown on the Construction Drawings, and ready to <br />receive overlying components of the lining system. The prepared surface <br />shall be free of major irregularities, which in the opinion of the QA/QC <br />CONSULTANT, may damage the overlying geomembrane. <br /> 4. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br />working days in advance of when the clay is completed and ready for as- <br />built surveys. The OWNER will survey the top of the clay liner to <br />determine that the required minimum thickness and grades have been <br />achieved. The survey shall be performed within two days of the clay liner <br />being completed and in accordance with Section 01410, SURVEYS. The <br />survey results will provide coordinates and elevations of the clay liner <br />surface at the established 50-foot grid and delineating prominent features. <br />The results of the survey shall be provided to the QA/QC CONSULTANT <br />for approval prior to placing overlying materials. The QA/QC <br />CONSULTANT shall have 2 working days to review survey results and <br />may independently verify survey results. The time taken by the QA/QC <br />CONSULTANT in checking and verifying the survey results will be <br />considered included in the total calendar days allotted the EARTHWORK <br />CONTRACTOR before liquidated damages are assessed. <br /> <br /> B. After completion of excavation in the base, and prior to clay liner construction, <br />proof-roll the excavation surface with a loaded dump truck or similar heavy- <br />wheeled vehicle to detect soft or loose zones. Notify the QA/QC CONSULTANT <br />prior to commencement of proof-rolling. If soft or loose zones are found, <br />excavate the soft or loose material to a depth accepted by the QA/QC <br />CONSULTANT, then fill and compact with Clay Liner Material. <br /> <br /> <br /> C. Clay Liner Compaction: <br /> <br /> 1. Start after the successful completion of the clay liner subgrade. <br /> 2. Soil shall be spread evenly over the prepared subgrade with a thickness as <br />required to achieve a 6-inch compacted lift, with a maximum 8-inch loose <br />lift.