My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 17 EARTHWORK <br />acceptance and control tests made on completed Work, on material samples <br />taken from the completed layer, and the thickness as calculated from the top <br />of subgrade and top of clay liner surveys. Acceptance testing for final <br />acceptance shall be performed by the soil testing laboratory in accordance <br />with these Specifications and the CQA Manual. <br /> <br /> G. Protection: <br /> <br /> 1. Do not route or allow construction traffic, except as necessary, on top of <br />clay liner once material has been placed and compacted. <br /> 2. Constructed clay liner shall be maintained to meet the requirements of this <br />Specification until final completion and acceptance of the Work. This shall <br />include all measures to prevent erosion. During seasonal or other extended <br />shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1, <br />PROTECTION OF EXPOSED SURFACES, of this Section. In addition, <br />the clay liner shall be protected from any contamination that increases the <br />hydraulic conductivity. Any contaminated material shall be removed and <br />replaced at no cost to the OWNER. <br /> <br />3.9 CONSTRUCTION OF CLAY EARTHFILL <br /> <br /> A. General: <br /> <br /> 3. Clay Earthfill Material shall be processed to meet the requirements of <br />Article 2.4 of this Specification. The EARTHWORK CONTRACTOR <br />shall determine construction procedures to be used, subject to the approval <br />and acceptance testing by the QA/QC CONSULTANT. <br /> 4. The EARTHWORK CONTRACTOR shall process the Clay Earthfill <br />Material suitable for the purpose intended. After processing, the Clay <br />Earthfill Material shall be free from dry clods, roots, organic matter, frozen <br />material, debris, rocks or stones larger than 1 inch, and other deleterious <br />material. Clay Earthfill Material shall be thoroughly blended and <br />compacted to provide a homogeneous material relatively uniform in <br />gradation and moisture content. <br /> 5. The Clay Earthfill Material shall be as uniform as possible, free of <br />penetrating cracks, and having interlift boundaries completely blended. The <br />soil shall be compacted to produce a soil structure having low hydraulic <br />conductivity. <br /> <br /> <br /> B. Compaction: <br /> <br /> <br /> 1. Soil shall be spread evenly over the prepared subgrade with a thickness as <br />required to achieve a 6-inch compacted lift, with a maximum 8-inch loose <br />lift. <br /> 2. The minimum final thickness and extent of the Clay Earthfill shall be as <br />shown on the Construction Drawings.
The URL can be used to link to this page
Your browser does not support the video tag.