My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 23 EARTHWORK <br />QA/QC CONSULTANT or DESIGN ENGINEER prior to start of the Work. <br />Approval does not absolve the EARTHWORK CONTRACTOR of <br />responsibilities for damage to the underlying geomembrane lining, at the <br />EARTHWORK CONTRACTOR's sole expense. <br /> <br /> D. Quality Control: <br /> <br /> 1. General: As the GDM is being placed, the QA/QC CONSULTANT will be <br />monitoring the construction activities and soil properties. If tests conducted <br />by the QA/QC CONSULTANT indicate that the GDM does not meet <br />specified requirements, the EARTHWORK CONTRACTOR shall <br />terminate material placement until corrective measures are taken. <br /> 2. GDM Acceptance: Final acceptance of the GDM will be based on all tests <br />made on completed Work on material samples taken from the completed <br />layer, on leak location testing and repair, and on thickness as determined by <br />the top of Clay Liner and top of GDM surveys. Testing for final <br />acceptance shall be performed by the QA/QC CONSULTANT in <br />accordance with these Specifications and the CQA Manual. <br /> <br /> E. Protection: <br /> <br /> 1. Do not route construction traffic on top of GDM once material has been <br />placed. <br /> 2. Constructed GDM shall be maintained to meet the requirements of this <br />Specification until final completion and acceptance of the Work. This shall <br />include all measures to prevent erosion. During seasonal or other extended <br />shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1 <br />of this Section. In addition, the GDM shall be protected from any <br />contamination that reduces the hydraulic conductivity. Any contaminated <br />materials shall be removed and replaced at no cost to the OWNER. <br /> <br />3.12 GEOTEXTILE <br /> <br /> A. The EARTHWORK CONTRACTOR shall place filter geotextile around coarse <br />gravel and above granular drainage material layer in accordance with <br />Section 02771, GEOTEXTILES, of these Specifications. <br /> <br />3.13 PROTECTIVE OPERATIONS LAYER <br /> <br /> A. General Requirements: <br /> <br /> 1. Protective Operations Layer shall be constructed of generally sandy <br />materials excavated onsite and shall be placed and compacted to the lines <br />and grades shown on the Construction Drawings or as required by the <br />QA/QC CONSULTANT. <br /> 2. Place protective operations to a height of approximately 10-ft (measured <br />along the slope) on lined slopes. <br /> 3. If any portion of the materials placed as Protective Operations Layer does
The URL can be used to link to this page
Your browser does not support the video tag.