Laserfiche WebLink
<br /> <br /> Forward Landfill WMU FU-23 02300 24 EARTHWORK <br />not meet the specified requirements, the EARTHWORK CONTRACTOR <br />shall remove such material and replace it with materials meeting the <br />Specification at no additional cost to the OWNER. <br /> 4. The constructed Protective Operations Layer shall be maintained to meet <br />the requirements of this Specification until final completion and acceptance <br />of the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be <br />protected with special treatments specified in Article 3.1, PROTECTION <br />OF EXPOSED SURFACES, above. <br /> 5. The EARTHWORK CONTRACTOR shall repair any geotextile or <br />Geocomposite damaged during fill placement at no cost to the OWNER. <br /> 6. Additional cover of Protective Operations Layer shall be provided over the <br />granular drainage material encapsulating the HDPE piping. For crossing <br />points, the area above the perforated leachate collection pipe shall be <br />covered with a minimum of 2.5 feet of Protective Operations Layer. <br /> 7. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br />working days in advance of when a layer is completed and ready for as-built <br />surveys. The OWNER will perform the as-built survey of the top of the <br />Protective Operations Layer to determine that the required minimum <br />thickness has been achieved. The survey shall be performed in accordance <br />with Section 01410, SURVEYS, and shall provide coordinates and <br />elevations of the surface at the established 50-foot grid and delineating <br />prominent features such as the edge of GDM. The QA/QC CONSULTANT <br />shall have 2 working days to review survey results and may independently <br />verify survey results. The time taken by the CQA Team in checking and <br />verifying the survey results will be considered included in the total calendar <br />days allotted the EARTHWORK CONTRACTOR before liquidated <br />damages are assessed. <br /> 8. A leak location test will be performed on the geomembrane before and after <br />placement of the granular drainage material and protective operations layer. <br /> The GEOSYNTHETICS CONTRACTOR shall be responsible for <br />repairing all identified leaks in the geomembrane prior to placement of the <br />overlying earthwork and geosynthetic materials. The EARTHWORK <br />CONTRACTOR shall be responsible for repairing all identified leaks in the <br />geomembrane following placement of the overlying earthwork and <br />geosynthetic materials. The EARTHWORK CONTRACTOR shall remove <br />all earthwork and geosynthetic materials overlying the geomembrane to the <br />extent required to repair the leak and shall repair all identified leaks in the <br />geomembrane at his sole expense. Following the repair of the leak in the <br />geomembrane, the EARTHWORK CONTRACTOR shall replace all <br />earthwork and geosynthetic materials at his sole expense. All Work <br />performed to repair and replace materials shall be performed in accordance <br />with the applicable Specifications sections. <br /> <br /> <br /> B. Placing Requirements: