My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 25 EARTHWORK <br /> <br /> 1. All synthetic materials underlying the Protective Operations Layer will be <br />inspected and approved by the QA/QC CONSULTANT prior to placement <br />of soil material. <br /> 2. Deposit material in lifts not less than 12-inches in depth (after compaction). <br /> Do not operate placement equipment over the underlying GDM and <br />geotextile with less than 12-inches of Protective Operations Layer in place. <br /> 3. Protective Operations Layer shall be placed in continuous and <br />approximately horizontal lifts for their full length and width using track- <br />type dozers unless otherwise specifically permitted by the DESIGN <br />ENGINEER or QA/QC CONSULTANT. <br /> 4. Method of dumping and spreading materials shall ensure uniform <br />distribution of the material. <br /> 5. No discing, ripping, or other mixing of the soil will be permitted within <br />12 inches of synthetic materials. <br /> <br /> C. Compaction Requirements: Compact using a minimum of two passes of a track- <br />type dozer unless otherwise approved by the QA/QC CONSULTANT or <br />DESIGN ENGINEER prior to the start of Work. Approval does not absolve the <br />EARTHWORK CONTRACTOR of responsibilities for damage to the underlying <br />geomembrane lining and geotextile, at EARTHWORK CONTRACTOR's sole <br />expense. <br /> <br /> D. Quality Control: <br /> <br /> 1. Particle Size Tests: Particle size tests may be performed by the QA/QC <br />CONSULTANT on the Protective Operations Layer. If particle size does <br />not meet specifications, terminate placement and take corrective action prior <br />to continuing placement. <br /> <br /> E. Protective Operations Layer Acceptance: <br /> <br /> 1. Final acceptance of the Protective Operations Layer will be based on tests <br />made on completed Work on samples taken from the completed layer, on <br />leak location testing and repair, and on thickness as determined by surveys <br />of the top of GDM and Protective Operations Layers. Testing for final <br />acceptance shall be performed by the QA/QC CONSULTANT in <br />accordance with these Specifications and the CQA Manual. <br /> <br />3.14 GENERAL EARTHFILL <br /> <br /> A. Place material in minimum 8-inch lifts and compact each lift to minimum 90 <br />percent relative compaction and within 3 percent of optimum moisture content <br />(ASTM D1557). <br /> <br /> B. Do not attempt to compact general earthfill that contains excessive moisture. <br />Aerate material by blading, discing, harrowing, or other methods, to hasten drying <br />process.
The URL can be used to link to this page
Your browser does not support the video tag.