Laserfiche WebLink
<br /> <br /> Forward Landfill WMU FU-23 02300 29 EARTHWORK <br /> A. Final acceptance will be based on tests made on completed Work, on samples of <br />material taken from the completed layers, and the as-built surveys. Testing for <br />final acceptance will be performed by the QA/QC CONSULTANT in accordance <br />with the requirements of these Specifications and the CQA Manual. <br /> <br />3.26 REMOVAL OF WATER <br /> <br /> A. Provide and operate equipment adequate to keep all excavations and trenches free <br />of water. Remove all water as required for efficient and safe execution of the <br />work, and as required by the QA/QC CONSULTANT. Avoid settlement or <br />damage to adjacent property. Dispose of water in a manner that will not damage <br />adjacent property. When dewatering open excavations, dewater from outside the <br />structural limits and from a point below the bottom of the excavation when <br />possible. Design dewatering system to prevent removal of fines from existing <br />ground. <br /> <br /> <br />PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br />AND PAYMENT PROCEDURES) <br /> <br /> END OF SECTION <br />