My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Landfill WMU FU-23 02300 28 EARTHWORK <br /> <br />3.23 SITE GRADING <br /> <br /> A. Perform all earthwork to the lines and grades as shown on the Construction <br />Drawings and/or established by the DESIGN ENGINEER. Shape, trim, and <br />finish slopes of channels to conform with the lines, grades, and cross sections <br />shown. Make slopes free of all exposed roots and stones exceeding 3-inch <br />diameter that are loose and liable to fall. Round tops of banks to circular curves, <br />in general, not less than a 6-foot radius. Rounded surfaces shall be neatly and <br />smoothly trimmed. Neatly blend all new grading into surrounding, existing <br />terrain, and maintain current drainage patterns or modify drainage as shown on <br />the Construction Drawings. Overexcavating and backfilling to the proper grade <br />will not be acceptable. Finished site grading will be reviewed by the QA/QC <br />CONSULTANT. <br /> <br />3.24 TOLERANCES <br /> <br /> A. Construct material limits within tolerance specified in Section 01410, SURVEYS. <br /> <br />3.25 TOPOGRAPHIC SURVEYS <br /> <br /> A. Refer to Section 01410, SURVEYS, for requirements regarding preconstruction <br />surveys. <br /> <br /> B. The OWNER will conduct detailed topographic surveys of site to document "as- <br />built" prepared subgrade on base and slope, thickness and grade of clay liner <br />installed, thickness of granular drainage layer installed, thickness of protective <br />operations layer installed, dimensions of termination berms and sumps, <br />terminations of geomembrane liner, and location of the interior crest of anchor <br />trenches. All surveys will be performed in accordance with Section 01410, <br />SURVEYS. <br /> <br /> 1. Measure area elevations on minimum 50-foot-grid over entire area and at all <br />breaks in grade. <br /> 2. Establish reference grid at minimum 50-foot centers for surveying materials <br />with a thickness requirement. <br /> 3. Measure linear dimensions a minimum of 50-feet on center. <br /> 4. Plot results of topographic surveys to scale of 1 inch equals 50 feet and <br />provide survey information in electronic format to QA/QC <br />CONSULTANT. <br /> 5. QA/QC CONSULTANT will check the survey. The EARTHWORK <br />CONTRACTOR shall not construct next layer of the lining system until <br />survey approval is provided by the QA/QCCONSULTANT. QA/QC <br />CONSULTANT's review shall be completed within 2 working days <br />following receipt of the as-built survey information. <br /> <br />3.24 ACCEPTANCE OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.