My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill WMU FU-23 <br />02771 5 GEOTEXTILES <br /> 2.5 LABELING A. Mark or tag geotextile rolls with the following information: 1. Manufacturer's name. 2. Product identification. 3. Lot number or date. 4. Roll number. 5. Roll dimensions. B. Mark special handling requirements on rolls. 2.6 DAMAGED GEOTEXTILE A. Geotextile damaged during transportation, loading, unloading, and delivery shall be documented by the QA/QC CONSULTANT. B. The GEOSYNTHETICS CONTRACTOR shall repair geotextile damaged before delivery to the satisfaction of the QA/QC CONSULTANT. If the geotextile can not be repaired to the satisfaction of the QA/QC CONSULTANT, the damaged geotextile shall be replaced by the GEOSYNTHETICS CONTRACTOR, at no cost to the OWNER. PART 3 EXECUTION 3.1 EXAMINATION A. Prior to installation of geotextile, examine underlying construction for conformance with specifications. 3.2 PROTECTION A. When placing soil materials over geotextile ensure the following: 1. No damage to geotextile. 2. No slippage of geotextile on underlying layers. 3. No excessive tensile stresses in the geotextile. B. Ensure that geotextiles are covered within 10 days of deployment. 3.3 DEPLOYMENT A. Follow manufacturer's recommendations, standards, and guidelines. B. Roll geotextile down slope keeping the geotextile sheet in sufficient tension to prevent folds and wrinkles. C. Weight geotextile with sandbags, or equivalent, to ballast during deployment. Leave ballast in place until geotextile is covered with succeeding construction layer.
The URL can be used to link to this page
Your browser does not support the video tag.