My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORWARD LANDFILL WMU FU-23 GEOCOMPOSITE <br />02774 3 DRAINAGE NET <br />2. Separate damaged rolls from undamaged rolls and store at locations designated by the OWNER until proper disposition of material is determined by the QA/QC CONSULTANT and the OWNER. 3. The GEOSYNTHETICS CONTRACTOR shall be responsible for damage to the Geocomposite during delivery, even if the rolls are unloaded by the EARTHWORK CONTRACTOR. The QA/QC CONSULTANT will determine damage. 4. Deliver in rolls, do not fold. C. Storage on Site: 1. Store Geocomposite rolls in the space allocated by the OWNER. 2. Store Geocomposite rolls to protect from puncture, dirt, grease, water, moisture, mud, mechanical abrasions, excessive heat or other damage. 3. Store Geocomposite rolls on prepared surface (not on wooden pallets). 4. Stack Geocomposite rolls no more than three rolls high. D. Handling on Site: 1. Use appropriate handling equipment to load, move, and deploy Geocomposite rolls. Appropriate handling equipment includes cloth chokers and spreader bars for loading, and spreader and roll bars for deployment. Dragging panels on ground surface will not be permitted. 2. Do not fold Geocomposite; folded material will be rejected. 3. The GEOSYNTHETICS CONTRACTOR is responsible for off-loading, storage, and transporting material from storage area to installation site. PART 2 PRODUCTS <br />2.1 GENERAL <br />A. Geocomposite with a nonwoven geotextile bonded to one side of the geonet. The geonet side shall be placed facing down. <br />2.2 GEOCOMPOSITE PROPERTIES <br />A. The GEOSYNTHETICS CONTRACTOR shall furnish geocomposites having properties that comply with the required property values shown in Table 02774-1. The GEOSYNTHETICS CONTRACTOR shall provide results of tests performed using the procedures listed in Table 02774-1, as well as certification that the materials meet or exceed the specified values. <br />B. In addition to the property values listed in Table 02774-1, the Geocomposites shall: <br />1. Retain their structure during handling, placement, and long-term service. 2. Be capable of withstanding outdoor exposure for a minimum of 15 days with no measurable deterioration. 3. Be chemically inert when immersed in the leachate from a typical sanitary landfill. 4. Geocomposite panels shall be of sufficient continuous length to cover the entire slope, including anchor trenches and runouts, without horizontal seaming.
The URL can be used to link to this page
Your browser does not support the video tag.