My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 3:56:42 PM
Creation date
1/3/2024 8:29:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231021
PE
2361 - UST FACILITY
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2908 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Egl M�,h <br /> h Y •"h x ? � .� �. k X , `X hxb h" <br /> OPW 71SO Overfill l teri is Important <br /> Prevention Valores In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The GARB-certified OPW 71 SO Float: Nitrile rubber, closed cell foam Storage Tank (UST), properly <br /> va or-ti ht Overfill Prevention Valve maintained delivery equipment <br /> p g Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential • <br /> underground storage tanks by providing Seals : Viton® fr- Delivery personnel should <br /> a ositive shut- off of product delivery. U er & lower Dro Tube : Aluminum be managed and trained <br /> P p ry pp p to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . 0 t missing parts. They should <br /> The OPW 71 SO allows easy installation Hardware : Stainless steel "A & "a always make certain there <br /> y , t is a positive connection <br /> (without breaking concrete) and requires <br /> Features between the adaptor and <br /> elbow. If delivery equipment <br /> no special manholes. ry <br /> 40 Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two Installation — no excavation or j or the elbow is not securely <br /> stage shut-off valve. When the liquid 5 coupled to the adaptor, a <br /> g q special manholes required. serious spill may result when <br /> level rises to about 95 % of tank Economical — costs a fraction the DPW 7150 closes, causing <br /> capacity, the valve mechanism is of expensive, complicated and a hazard and environmental <br /> p <br /> released, closing automatically withcontamination , <br /> the flow. This reduces the flow rate to difficult to-install valves. t ; <br /> approximately 5 gpm through a bypass 46o' Furnished Complete — supplied NOTE : The OPW 71 SO is <br /> valve, The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time, fill applications, <br /> exceeds the 95 % level, the valve will 40 Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets + Retrofits Directly — for both new <br /> is attempted , and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . 41� Quick Drain Feature — <br /> liquid rises to about 98 % of tank o6p No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level , pressure is relieved. <br /> completely. No additional liquid can flow 4p. Will Accept a Dipstick 4� Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point. • OPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention : <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and Completely Automatic faster fill times and reducing <br /> review local , state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the 4. Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfill revention: " kick " <br /> other considerations such as extreme p the tank until the hose kick that <br /> tank tilt. In all cases, the upper tube do Keeps the Top of UST " Dry, accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 61 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level , <br /> off flow into the tank completely before bung fittings and the need for 4o� Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines, Installation — in both two-point <br /> EPA requirements. 40� Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> r Look for this label for <br /> Listings an (I r l tEvB authentic OPW EVR <br /> callfornia Air �' Approved products. <br /> Certifications it Board c� i� .rva t OPW 71SOM is EVR Approved for E85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.