My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 3:56:42 PM
Creation date
1/3/2024 8:29:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231021
PE
2361 - UST FACILITY
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2908 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A � I Envirortrrter�tal Health Department <br /> C C) l_1 N T Y - .- <br /> UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 , Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced , Ensure a copy of <br /> the " Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done . ( If adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Replace existing straight drop tubes with drop tubes with overfill valves on all tanks <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third-party approval ) : <br /> 3 ) OPW71 SO Drop tube with overfill prevention valves <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone (_) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.