Laserfiche WebLink
= P-nuiN <br /> - CO SAN J O A Q U I N Environmental Health Department <br /> )pfir <br /> COUNTY Jasjit Kang , REHS , Director <br /> °qui P Greatness 9 r o w s here . Muniappa Naidu , REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Steven Shih , REHS <br /> Elena Manzo , REHS <br /> Natalia Subbotnikova , REHS <br /> February 28 , 2024 <br /> Carrie Miller <br /> Elite IV Contractors <br /> 2535 Wigwam Dr <br /> Stockton , CA 95205 <br /> carrie@eliteiv . com <br /> Re : LATHROP GAS & FOOD INC SR0087759 <br /> 140 E Lathrop Rd , Lathrop , CA 95330 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • Replace the direct- bury Diesel #2 spill container with upgraded replaceable spill container <br /> ( OPW 1 C-2200D) <br /> • Add 87 -octane drop tube with shut- off valve (flapper) (OPW 71 SO) <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire district , the San Joaquin Valley Air Pollution Control District , and the local <br /> community development department for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for written approval <br /> prior to commencing work . All new submittals supersede previous ones . <br /> 3 . Email notification to ustj sigov . orq to arrange the following inspection appointments . <br /> All appointments must be scheduled at least 48 hours in advance . <br /> a . Corrosion protection : Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling . <br /> b . Spill bucket test : Verify minimum 5-gallon capacity . Pass a one- hour hydrostatic test (or <br /> equivalent) . Verify proper drainage method . <br /> c . Verification of overfill prevention : Measurement of drop tubes to verify 95 % tank volume <br /> shut off, verification of external audible/visual alarm activation when tank is 90 % full , or <br /> other approved method . Ensure that all pertinent tank charts and calculations are available <br /> for review at the time of inspection . <br /> d . Verification that ball float ( s ) , if installed , do not interfere with the installed flapper valve . <br /> e . Since concrete will be broken near the diesel tank , a secondary containment test must be <br /> performed on the diesel tank once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> The facility cannot receive fuel in the diesel tank prior to the EHD inspection and approval . <br /> 4 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> 1868 E . Hazelton Avenue Stockton , California 95205 T 209 468-3420 1 F 209 464 -0138 1 www . sjgov . org/ehd <br />