My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015977
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTEBELLO
>
768
>
2600 - Land Use Program
>
PA-2300281
>
SU0015977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2024 8:30:02 AM
Creation date
1/24/2024 4:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015977
PE
2632
FACILITY_NAME
PA-2300281
STREET_NUMBER
768
Direction
N
STREET_NAME
MONTEBELLO
STREET_TYPE
ST
City
MOUNTAIN HOUSE
APN
25650005
ENTERED_DATE
12/15/2023 12:00:00 AM
SITE_LOCATION
768 N MONTEBELLO ST
RECEIVED_DATE
1/24/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project construction and operation. <br /> kk. The Developer shall install catch basin filters, Water Decontaminator per MHCSD Standard <br /> Specification and Details, and/or other source control Best Management Practices (B.M.P.$) <br /> for runoff from the project prior to issuance of the building permit. <br /> II. Project Developer shall develop and submit a Project Stormwater Plan that identifies the <br /> methods to be employed to reduce or eliminate stormwater pollutant discharges through the <br /> construction, operation, and maintenance of source control measures, low impact <br /> development design, site design measures, stormwater treatment control measures, and <br /> hydromodification control measures. Timing: Prior to issuance of an encroachment permit. <br /> mm. Runoff from non-residential areas shall be pretreated on-site before discharge into the <br /> MHCSD public stormwater collection system. <br /> nn. Catch basin inserts-(Decontaminators) shall be installed in each storm drain. The decontaminator <br /> shall comply with MHCSD Detail SD-22. The type of decontaminators has to be pre-approved by <br /> MHCSD." <br /> oo. "A'No Dumping' marker shall be installed at each catch basin after the catch basin is installed <br /> per Detail SD-04." <br /> pp. Grates and Inlets shall be protected with geo-fabric material during any nearby construction. <br /> qq. The contractor will be responsible for purchasing, installing, maintaining all the catch basins <br /> and other storm drain inlets and decontaminators until project is accepted. <br /> rr. Recyclable Construction Waste: Recycling of construction wastes, such as wood and metal, <br /> shall be made part of the improvement plans and construction specifications for contractors in <br /> compliance with MHCSD requirements. <br /> ss. Designated Waste Hauler Provider: The MHCSD's designated waste hauler, West Valley <br /> Disposal, shall be used for disposal of waste material and recycling of recyclable materials. No <br /> other waste haulers are allowed. Requirement shall be noted on improvement plans. <br /> tt. Construction Water Usage: An encroachment/hydrant permit is required prior to using water <br /> for construction purposes from a hydrant or any other potable water source. <br /> Landscape and Architecture <br /> uu. The parkway strip landscaping shall be consistent with the approved NH H Landscape <br /> Guidelines. Timing: Prior to plan approval. <br /> vv. Landscape slopes within street right of way, pedestrian access connections, and parks <br /> shall not exceed 3:1 unless approved otherwise by the MHCSD General Manager. <br /> ww.The applicant shall repair and complete any unfinished landscaping in the planter strip <br /> along all frontages to the property. <br /> xx. Street trees in the parkway strip shall be installed per MHCSD standard Details LC-04, <br /> LC-06, LC-09, LC-12, LC-13 and LI-09. Timing: Prior to plan approval. <br /> yy. Turf in the landscape strip shall have subsurface irrigation system like eco-mat or <br /> approved equivalent. Prior to plan approval. <br /> zz. Each street tree shall be planted in a street tree planter. On collector roads the planter <br /> PA-2300280 and PA-2300281 —Conditions 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.