SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> d . Verification of all pipe setbacks , crossovers , and burial depth according to the manufacturer' s <br /> installation instructions and verification of appropriate piping backfill . <br /> e . Integrity testing of all sumps per the manufacturer' s installation instructions . <br /> of. Verification of the dispenser footprints contained by the under-dispenser containment <br /> sumps ( UDCs) . Any potential leaks from piping and fuel filters must drain directly into <br /> UDCs . <br /> g . Visual inspection of the piping within the dispensers . <br /> h . Corrosion protection : Verify corrosion protection for spill bucket prior to backfilling . <br /> i . Spill bucket test : Verify minimum 5 -gallon capacity . Pass a one- hour hydrostatic test (or <br /> equivalent) , after concrete is set . Verify proper drainage method . <br /> j . Verification of overfill prevention : Measurement of drop tubes to verify 95 % tank volume <br /> shut off, verification of external audible/visual alarm activation when tank is 90 % full , or <br /> other approved method . Ensure that all pertinent tank charts and calculations are available <br /> for review at the time of inspection . <br /> k . Verification that ball float ( s) , if installed , do not interfere with the installed flapper valve <br /> I . Monitoring system functionality : Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of California Code of <br /> Regulations ( CCR) Title 23 and California Health & Safety Code ( HSC ) Chapter 6 . 7 . If a <br /> cold start of the monitoring panel is performed a copy of the alarm history shall be printed <br /> prior to performing the cold start and made available at time of EHD inspection . <br /> m . Leak detector test : Verify the device can detect a leak of 3 gallons per hour at 10 psi . Verify <br /> line volumes are appropriate for the make and model of the installed leak detectors . <br /> n . Since concrete will be broken near the tanks a secondary containment test must be <br /> performed on the tanks once concrete is poured in accordance with the manufacturer' s <br /> guidelines <br /> The facility cannot operate the UST system or receive fuel in the 87 , 91 and diesel tanks <br /> prior to the EHD inspection and approval. <br /> 4 . Secondary containment testing for the turbines , UDCs and product piping is required six <br /> months after installation . Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors <br /> State License Board ( CSLB ) <br /> • A current UST Installation /Retrofitting certificate issued by the International Code Council <br /> ( ICC ) <br /> • A valid , current certificate of training from the manufacturer(s) of the component (s) being <br /> installed . <br /> 6 . Any individual performing the work of a service technician must possess , or work under the direct <br /> and personal supervision of an individual physically present at the work site at all times while <br /> work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the CSLB <br /> • A current California UST Service Technician certificate issued by the ICC <br /> • A valid , current certificate of training from the manufacturer(s ) of the component (s) being <br /> tested , or the developer of the testing equipment or test method (s ) being used <br /> 2 of 3 <br />