My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2026 7:45:09 PM
Creation date
1/24/2024 4:29:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0518458
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1442 Colony DR RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMPIUDC TEST (continued) <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br />Test Equipment Used: lncon STS <br />Sump/UDC ID <br />UDC 112 <br />UDC 314 <br />UDC 516 <br />UDC 718 <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />12:20 <br />12:20 <br />Test Start Time <br />11:54 <br />12:20 <br />11:54 <br />11:54 <br />Initial Reading <br />5.5720 <br />5.2959 <br />6.2511 <br />6.7319 <br />Test End Time <br />12:09 <br />12:35 <br />12:09 <br />12:09 <br />Final Reading <br />5.5701 <br />5.2960 <br />6.2509 <br />6.7310 <br />Change in Reading <br />0.0019 <br />0.0001 <br />0.0002 <br />0.0009 <br />Pass/Fail Criteria <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />N Pass ❑ Fail <br />IR Pass ❑ Fail <br />SumpIUDC ID <br />UDC 9110 <br />UDC 11112 <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />12:20 <br />12:20 <br />Initial Reading <br />6.1444 <br />4.5802 <br />Test End Time <br />12:35 <br />12:35 <br />Final Reading <br />5.1442 <br />4.6801 <br />Change in Reading <br />0.0002 <br />0.0001 <br />Pass/Fail Criteria <br />0.002 <br />0.002 <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.