My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:57:20 AM
Creation date
1/31/2024 1:35:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231176
PE
2361 - UST FACILITY
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2701 W MARCH LN STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MARCH LANE 76* as of February 13 , 2024 . <br /> Open violations from December 07 , 2023 inspection <br /> Violation #208 - Failure to comply with the designated operator inspection requirements . <br /> 1 . OBSERVATION: The designated operator failed to check and note the correct test dates for the Spill <br /> Containment Test on the designated operator inspection reports. The correct date for Spill Containment Test is <br /> 12/ 12/2022 but was listed as 12/22/2022 on multiple designated operator reports . <br /> REGULATION GUIDANCE: During the inspection , the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done . <br /> CORRECTIVE ACTION : Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports . <br /> 2 . OBSERVATION The designated operator failed to check and note all required items on the visual inspection <br /> reports . The incorrect and missing information included the following from the inspection reports : <br /> - Multiple Designated Operator Reports did not have Section 5 completed for owner to respond to Designated <br /> Operator Compliance Issues listed in Section 3 <br /> - The 11 /29/2023 Designated Operator Report did not have Section 7 and 8 completed and did not have Mechanical <br /> float mechanisms used in UDCs checked in Section 9 <br /> - The 11 /02/2023 Designated Operator Report noted that there was liquid in UDC 9/10 in Section 3 but marked that <br /> UDC 9/ 10 was free of damage , water, debris and hazardous substances in Section 9 <br /> REGULATION GUIDANCE: During the visual inspection , the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION : Ensure that designated operators performing visual inspections at this facility are including <br /> all of t e required information on the reports . <br /> This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> hcG U L &'I —err 0'ZG ` t/ L <br /> Violation #209 - Failure to maintain a copy of the " Facility Employee Training Certificate" on-site . <br /> OBSERVATION: The Facility Employee Training Certificate dated 11 /2/2023 , 6/ 14/2023 , 4/ 18/2023 , 3/21 /2023 did <br /> not have accurate initial training dates or assuming responsibilityadates <br /> REGULATION GUIDANCE: All site employees must be trained prior to taking responsibility as a facility employee if <br /> after October 1 , 2018 , or within 30 days of hire if prior to October 1 , 2018 . The Facility Employee Training <br /> Certificate shall contain accurate information for all employees trained . <br /> CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br /> submit a copy of the updated form to the EHD . <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.