Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MARCH LANE 76* as of February 13 , 2024 . <br /> Open violations from December 07, 2023 inspection <br /> Q This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : DOC t,t rh �J- ti2tA � �/ L O d <br /> D U t ✓V CA � .PS Un 14jC1 l -4'V WW:) GI <br /> Violation #304 - Failure to construct, operate , and maintain primary containment as product-tight. <br /> OBSERVATION A leak was observed in the diesel product piping and an accumulation of liquid in the UDC of <br /> dispenser 9/ 10 indicating a leak in the primary containment. <br /> REGULATION GUIDANCE: All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION : Immediately have a properly licensed , trained , and certified contractor repair or replace the <br /> failed component(s ) , under permit and inspection of the EHD if necessary , <br /> V/ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included r� <br /> Describe actions taken or will be taken to correct violation : , 1.eL/e!: o Lol }orkl <br /> 1/),(t ; V t I t4'e4 Z S � <br /> Page 4 of 4 <br />