Laserfiche WebLink
during the 2018-2019 winter season. Access roads will be monitored on a daily basis and will be <br />maintained, as needed, via the placement of gravel and/or the use of a motor grader. <br />The exit road from the landfill is paved to prevent track -out. Forward Landfill has constructed a <br />tire wash station along the main landfill exit road to efficiently clean truck tires. The tire wash <br />station was completed in November 2013 and the length extended by 30 -ft in 2015. In addition, <br />exit roads and Austin Road will be reviewed on an hourly basis and will be cleaned by sweeper <br />truck and water truck, as needed, to prevent any build-up of mud. <br />8. Winter Deck <br />The winter deck is constructed using a combination of gravel, crushed, concrete road base, and <br />broken and ground tile. The two winter decks are located on WMU FU -17 (see Figures 1 & 2). <br />