Laserfiche WebLink
4. Leachate <br />All active WMUs are built to Subtitle "D" standards and have complete leachate collection and <br />removal systems (LCRSs) installed. Leachate is collected at the sump located in each WMU and <br />directed to one of two leachate evaporation ponds. One pond is located in the southwest corner of <br />the southern portion of the Forward Landfill. The other is located directly west of WMU FU -03. <br />The volume of leachate discharged to the leachate ponds is recorded in an onsite log. <br />The site will be routinely inspected for leachate seeps from the landfill slopes. The inspections <br />will be performed daily and any observed leachate seeps will be recorded in the inspection log. If <br />seeps are observed, the site engineer will be contacted and the cause of the seep will be <br />investigated. The LEA will also be notified. <br />Remedial measures will be designed and implemented to control leachate seeps. The remedial <br />action plan will be submitted to the LEA for review and approval, prior to implementing the plan. <br />All constructed WMUs at the site have been approved for disposal by the RWQCB. <br />6. Disposal Treatment Areas <br />The WMUs that may receive waste during the winter of 2018-2019 include FU -03, FU -04, FU - <br />05, FU -06, FU -08 Phase I, FU -08 Phase Il, FU -10, FU -13, FU -14, and FU -17. Compost -overs <br />may be stockpiled near the working face and will be utilized as necessary for traction control at <br />the active face of the landfill. Compost -overs utilized for traction control will not be utilized as <br />daily cover but will instead be treated as disposal at the end of the day and covered with approved <br />daily cover materials. Any shredded tire usage will be utilized in accordance with the approved <br />Shredded Tires Operations Plan from the Forward Landfill Joint Technical Document (JTD). <br />7. Access <br />Roads necessary for the safe operation of Forward Landfill during inclement weather are graded <br />to promote drainage and direct water to a central collection point. Roads are winterized with <br />asphalt, road base, crushed concrete, gravel, and recycled asphalt. Gravel has been delivered to <br />the site and divided into strategically placed piles to perform repairs as necessary to the roads <br />