Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 1-Regular 87 2-Diesel <br /> Tank Manufacturer XERXES XERXES <br /> Tank Capacity 15K 15K <br /> Test Start Time Exempt Exempt <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 1-Regular 87 2-Diesel 3-Diesel-Sat <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time See page 5 See page 5 See Page 5 <br /> Initial Reading Not tested Not tested Not tested <br /> Test End Time NA NA NA <br /> Final Reading NA NA NA <br /> Change in Reading NA NA NA <br /> Pass/Fail Criteria NA NA NA <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />