My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2024 3:17:40 PM
Creation date
2/21/2024 3:12:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231141
PE
2361 - UST FACILITY
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1810 E HAZELTON AVE STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-PS 2-Diesel-PS <br /> Sump Manufacturer XERXES XERXES <br /> Sump Depth (inches) 38" 41" <br /> Sump Bottom to Top of 16" 18" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time See page 5 See page 5 <br /> Initial Reading Not tested Not tested <br /> Test End Time NA NA <br /> Final Reading NA NA <br /> Change in Reading NA NA <br /> Pass/Fail Criteria NA NA <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 1&2 UDC 3&4 UDC 4-Sat <br /> Sump Manufacturer Bravo Bravo Bravo <br /> Sump Depth (inches) 30" 30" 30" <br /> Sump Bottom to Top of 9" 9" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:15 9:14 9:12 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 9:45 9:44 9:42 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.