My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_POST CLOSURE LAND USE PROPOSAL 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
0
>
4400 - Solid Waste Program
>
PR0504909
>
ARCHIVED REPORTS_POST CLOSURE LAND USE PROPOSAL 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 9:41:24 AM
Creation date
2/27/2024 8:46:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
POST CLOSURE LAND USE PROPOSAL 2014
RECORD_ID
PR0504909
PE
4430
FACILITY_ID
FA0006400
FACILITY_NAME
RIVERBANK CITY DUMP
STREET_NUMBER
0
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
SANTA FE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Riverside <br /> (8)Periodic methane gas monitoring shall be conducted inside all buildings and <br /> underground utilities in accordance with Section 20933 of Article 6, of <br /> Subchapter 4 of Title 27. <br /> No buildings are planned as part of the solar array improvements. <br /> 69 The LEA may require that an additional soil layer or building pad be placed on the final <br /> cover prior to construction to protect the integrity and function of the various layers of <br /> final cover. <br /> The proposed solar array improvements will not be in direct contact with the final cover barrier <br /> as shown on Drawing S2 in Appendix C,page 151 of this PDF. The arrays will be supported by <br /> concrete skids,which will have a layer of aggregate between the cover and the bottom of the <br /> skids. Care will be taken when moving solar panel skids. <br /> (g) All onsite construction within 1,000 feet of the boundary of any disposal area shall be <br /> designed and constructed in accordance with subparagraphs (I through 7), or in <br /> accordance with an equivalent design which will prevent gas migration into the building, <br /> unless an exemption has been issued: <br /> No buildings are planned as part of the solar array improvements. All existing structure are <br /> monitored in accordance with the 1993 Closure and Postclosure Maintenance Plan and its <br /> Amendments, (Earth Technology Corporation, 1993). <br /> 9 SUPPLEMENTAL MAINTENANCE PROGRAM <br /> 9. 1 INTRODUCTION <br /> A supplemental maintenance program will be implemented at the West Riverside Landfill after <br /> installation of the solar arrays and will continue for the life of the solar array system, <br /> approximately 20 years. This section describes the responsibilities, resources, and inspection <br /> frequency for carrying out the maintenance plan. Specific inspection and maintenance activities <br /> are detailed in subsequent Sections 9.2 through 9.5. <br /> 9.2 INSPECTION, MONITORING, AND MAINTENANCE <br /> PROGRAM <br /> 9.2. 1 Landfill Cover <br /> 27 CCR 21090 <br /> A supplemental maintenance program will be conducted by SEI, and verified by the County, at <br /> the Landfill to verify that the landfill final cover retains its integrity and effectiveness. The final <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.