Laserfiche WebLink
County of Riverside <br /> (b) The design shall consider one or more proposed uses of the site toward which the <br /> operator will direct its effect. <br /> The installation of an 8.5 megawatt solar generating facility is the intended use of the site. The <br /> site improvements have been designed to avoid penetrations to the cover and to minimize any <br /> potential future damage associated with settlement. <br /> (c) All post closure land uses, other than open space, on sites implementing closure or on <br /> closed sites shall be submitted to the LEA, CalRecycle, RWQCB, local air district and <br /> land use agencies. <br /> This PCLUP has been prepared to meet the requirements of Title 27, Section 21190 and will be <br /> submitted to the agencies having jurisdiction at the closed West Riverside Landfill. <br /> (d) Construction on the site shall maintain the integrity of the final cover, drainage and <br /> erosion control systems, and gas monitoring and control systems. <br /> Construction of the proposed solar arrays will have a minimal effect on the existing cover <br /> barriers as previously described. No penetrations of the cover are planned. <br /> (e) Construction of structural improvements on top of landfilled areas during the post <br /> closure period shall meet the following conditions: <br /> (1) , (2), and(3)Automatic methane gas sensors, designed to trigger an audible alarm <br /> when methane concentrations are detected, shall be installed in all buildings. <br /> There are no buildings or basements associated with the solar array installations, therefore <br /> accumulation of methane in buildings is not anticipated. <br /> (4) and(5) Utilities shall be constructed to mitigate the effects of differential settlement. <br /> All utilities shall be designed with flexible connections and utility collars. <br /> Utilities associated with the solar arrays will be installed above the closure barriers with flexible <br /> connectors to accommodate differential settlement. <br /> (5) And(7)Piling shall not be installed in or through any bottom liner unless approved <br /> by the RWQCB. Penetration through the low permeability layer offinal cover must <br /> be sealed and repaired. <br /> No penetration of the final Landfill cover are proposed. <br /> 7 <br />