County of Riverside <br /> Drainage facilities <br /> A network of lined drainage ditches and down chutes is present on the final cover to collect and <br /> manage runoff from precipitation events. The northwest portion of the landfill has been <br /> designed to drain northerly to a ditch along 26th Street and westerly to Hall Avenue. Storm water <br /> ditches on Hall Avenue collect and convey runoff to the drainage ditch adjacent to the southwest <br /> portion of the site. <br /> Surface drainage from the southwest portion of the site flows to the west, south, and east. An <br /> existing drainage ditch conveys flows south from the southwest corner of this portion of the site, <br /> then easterly along the southern border to a box culvert under State Highway 60 at the <br /> approximate midpoint of the south boundary. <br /> The eastern portion of the site is served on three sides by a drainage channel that also drains into <br /> the box culvert under State Highway 60. <br /> 4 SURFACE PREPARATION AND DESIGN LOADING <br /> The site may be stripped of vegetation in preparation for the racking and panel mounting <br /> systems. The Project Proponent shall request an MSHCP/nesting bird clearance survey through <br /> the County prior to scheduling any weed abatement/mowing activity. The County shall provide <br /> a calendar period when abatement activities may occur. County will also identify areas where <br /> abatement work is prohibited, if any. No excavation of the vegetative layer will occur in order to <br /> avoid damage to the landfill cover system. Additional soil and, or aggregate will be placed as <br /> shown on the design plans, Appendix C. The soil stabilization proposed will either be a low <br /> growth plant mix recommended by a horticulturist or aggregate base placed in the array field and <br /> access road to serve this purpose. Soil stabilization materials and application methodologies <br /> shall be subject to County and Regulatory Agency approval prior to implementation. <br /> The design load calculations for the ground-mounted and column supported solar arrays were <br /> prepared by Stronghold Engineering and are presented in Appendix C. The loads were used to <br /> size the pads under the ground-mounted arrays and to size the column footings. A geotechnical <br /> investigation and report was prepared by Geotechnical Professionals Inc. (GPI), February 2014. <br /> The recommendation of the report was to keep the ground pressure on the existing landfill soil <br /> cover less than a maximum bearing pressure of 750 pounds per square foot(psf). <br /> 5 ESTIMATED SETTLEMENT <br /> The maximum settlement of the cover in post-closure for self-weight and other general loads was <br /> estimated to be up tol6 feet. Approximately 4 feet of settlement has occurred thus far in post- <br /> closure. Additional settlement calculations have been prepared in Appendix D (page 192 of this <br /> PDF) for the design loads on the ground-mounted and column footings as part of this PCLUP. <br /> The maximum area settlement is estimated to be up to 12 feet with a maximum differential <br /> settlement of 1-foot over the Post-Closure period. Existing infrastructure may be impacted by <br /> 4 <br />