County of Riverside <br /> the estimated settlement and will require repair. It should be noted that the added settlement for <br /> the proposed project is less than 1 foot out of the remaining 12 feet of settlement. <br /> 6 SOLAR PROJECT CONSTRUCTION CQA <br /> A Construction Quality Assurance Program(CQA)will be implemented during construction. It <br /> is recommended that a third party CQA Representative, hired by SEI, observe and document the <br /> solar array installation. To assure that the cover will not be damaged during construction of the <br /> solar arrays,the following CQA program measures will be implemented. <br /> Pre-Construction—A pre-construction meeting will be held between SEI, the CQA <br /> Representative, and the County to review the project installation process and expectations. SEI <br /> will submit documents which describe the installation equipment and procedures as well as the <br /> measure to be taken if damage to the landfill cover is identified by the CQA Representative. <br /> Damage is defined as disturbance of the existing soil cover of more than 1-inch of depth. Repair <br /> is defined as placement of soil or grading to restore the existing cover surface material in <br /> accordance with the closure CQA Plan,page 275 of this PDF, and Specifications (Earth <br /> Technology Corporation, 1993), page 209 of this PDF. <br /> Construction—The CQA Representative (under the direction of a California certified <br /> Professional Engineer or Geologist)will be present onsite full-time during earth work. Since the <br /> solar work is on the surface of the cover and visible, full-time observation by the CQA <br /> Representative will not be necessary. An initial topographic survey and post-construction <br /> topographic survey will be performed by SEI to document construction settlement. The CQA <br /> Representative will approve, observe, and document preparation and placement of the solar <br /> arrays, associated equipment, and connecting wiring. Problems with the work will be discussed <br /> with SEI and the County at meetings held as necessary to present the problems and implement <br /> their correction. Weekly construction progress reports will be prepared by CQA and forwarded <br /> to regulatory agencies upon request. The reports will consist of visual observation and a <br /> photographic record created and maintained by the CQA Representative. <br /> Post-Construction— SEI, the County, the regulatory agencies, and the CQA Representative will <br /> conduct a post-construction inspection of the completed solar installation. Problems and repairs <br /> will be identified and added to a punch list for SEI to complete. The CQA Representative will <br /> verify completion of the punch list and will prepare a certification report documenting the earth <br /> work and solar array installation. <br /> 7 COVER MAINTENANCE DURING CONSTRUCTION <br /> During construction, drainage and cover maintenance will be performed by SEI. The drainage <br /> and cover features for the landfill are shown on Figure 5. Drain pipes and surface ditches will <br /> be inspected on an ongoing basis, in accordance with the construction SWPPP, for signs of <br /> silting or blockage and will be cleaned when access to the location allows. SEI shall protect in <br /> 5 <br />