Laserfiche WebLink
<br /> <br /> <br />the COMMENTS section. <br />Page 2 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br />Tank ID 1-87-Main 2&3-87S-91 4,5,&6-R-D-R <br />Tank Manufacturer Mod Wld Mod Wld Mod Wld <br />Tank Capacity 12K 12K-2 compt 12K-3 compt <br />Test Start Time 8:55 8:59 8:50 <br />Initial Reading -10" Hg. -10" Hg. -10" Hg. <br />Test End Time 9:55 9:59 9:50 <br />Final Reading -10" Hg. -10" Hg. -10" Hg. <br />Change in Reading 0" Hg. 0" Hg. 0" Hg. <br />Pass/Fail Criteria No Loss No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Pipe Run ID 1-87-Main 2-87-Siphon 3-91 4-110 Race <br />Pipe Manufacturer Ameron Ameron Ameron Ameron <br />Test Start Time 8:30 8:35 8:40 8:50 <br />Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br />Test End Time 9:30 9:35 9:40 9:50 <br />Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br />Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br />Pass/Fail Criteria No Loss No Loss No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Pipe Run ID 5-Diesel 6-100 Race <br />Pipe Manufacturer Ameron Ameron <br />Test Start Time 8:55 9:00 <br />Initial Reading 5 Psi 5 Psi <br />Test End Time 9:55 10:00 <br />Final Reading 5 Psi 5 Psi <br />Change in Reading 0 Psi 0 Psi <br />Pass/Fail Criteria No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />6. TANK SECONDARY CONTAINMENT TEST <br />7. PIPE SECONDARY CONTAINMENT TEST