Laserfiche WebLink
<br /> <br /> <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-87-PS-Main 2-87-PS-Siph 3-91-PS 4-110 R-PS <br />Sump Manufacturer Western FG Western FG Western FG Western FG <br />Sump Depth (inches) 36" 36" 34" 30" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />16" 14" 15" 13" <br />Test Start Time 8:42 8:47 8:52 9:32 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 9:12 9:17 9:22 10:02 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID 5-Diesel-PS 6-100 R-PS <br />Sump Manufacturer Total Cont. Total Cont. <br />Sump Depth (inches) 30" 30" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />11" 12" <br />Test Start Time 9:37 9:42 <br />Initial Reading .001 .001 <br />Test End Time 10:07 10:12 <br />Final Reading .001 .001 <br />Change in Reading 0 0 <br />Pass/Fail Criteria > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST