Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used:0-30inHg. 4” Vacuum Gauges w/ 0.05 graduations <br />Tank ID T-1 87 T-2 91 / T-3 DSL <br />Tank Manufacturer Modern Welding Modern Welding <br />Tank Capacity 12k 6k / 6k <br />Test Start Time 8:35am 8:35am <br />Initial Reading -10.0 inHg -10.0 inHg <br />Test End Time 9:35am 9:35am <br />Final Reading -10.0 inHg -10.0 inHg <br />Change in Reading 0.0 inHg 0.0 inHg <br />Pass/Fail Criteria No No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used:Dual 0-15psi 4” Pressure Gauges w/ 0.05 graduations <br />Pipe Run ID T-1 87 PL T-2 91 PL T-3 Diesel PL <br />Pipe Manufacturer A.O. Smith A.O. Smith A.O. Smith <br />Test Start Time 8:45am 8:45am 8:45am <br />Initial Reading 5.0psi 5.0psi 5.0psi <br />Test End Time 9:45am 9:45am 9:45am <br />Final Reading 5.0psi 5.0psi 5.0psi <br />Change in Reading 0.0psi 0.0psi 0.0psi <br />Pass/Fail Criteria No Loss No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />6. TANK SECONDARY CONTAINMENT TEST <br />7. PIPE SECONDARY CONTAINMENT TEST