My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
COMPLIANCE INFO_2000-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 10:00:01 AM
Creation date
3/18/2024 2:28:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2008
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
if Page 5 of 18 <br />Most of the materials received consist of woody material with a small percentage of <br />materials that have a high moisture content, such as grass clippings. <br />B. Feedstock Characteristics <br />The feedstock consist of green material, yard trimmings, and wood waste, as they are <br />defined in 14 CCR 17852. <br />C. Airborne Emission Production <br />and screening processes. The chipping and grinding equipment is fitted with misters to <br />reduce airborne emissions. If airborne emissions become a problem during loading, <br />water can be applied. <br />D. Process Water Distribution <br />Other than rainfall, no water is added to the feedstock or chipped and ground material. <br />Water is applied by misters on the chipping and grinding equipment, most of which is <br />absorbed during the chipping & grinding and screening processes. Water is also added <br />using the water truck <br />E. <br />F. Pad and Site Drainage and Permeabifity <br />8/27/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.