Laserfiche WebLink
Since the compost able material handling, storage and processing is completed on the <br />Closed landfill, a two foot thick working pad was constructed that has been graded to <br />minimize ponding and convey runoff to the designed drainage structures. Storm water <br />sampling is conducted in accordance with the landfill's waste discharge requirements/ <br />monitoring and reporting program. <br />G. Equipment Reliability <br />All Equipment is maintained per the manufacturers recommendations. <br />IL Personal Training <br />1111111 liq <br />subjects pertinent to the site operation and <br />Maintenance, such as this 01W, load checking procedures and heavy equipment <br />operations (front loader/excavator and tub grinder). The contractor maintains their <br />personnel's training record. <br />L Weather Event Impacts <br />The only weather event impact is heavy rainfall which could impede processing <br />Page 6 of 18 <br />8/27/2003 <br />