My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
COMPLIANCE INFO_2000-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 10:00:01 AM
Creation date
3/18/2024 2:28:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2008
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 Page 7 of 18 <br />activities. However, there is ample storage space available in the event operations <br />have to temporarily cease due to adverse weather conditions. <br />J. Utility Service Interruptions <br />All equipment is powered by diesel engines and 550 -gallon fuel storage tank is <br />maintained on-site. <br />iOTMOMMIM, M, <br />The primary sources pf odors from this activity may occur during the screening process <br />and when loading the product that is being shipped to market, in particular with the mulch. <br />If stockpiled for an extended period of time, the mulch products may result in an <br />anaerobic condition and create objectionable odors. As a result, the contractor works <br />diligently to remove the mulch products from the site within 90 days of processing and <br />other chipped and ground material within 90 days of processing. The operator plans to <br />manage all compostable material handling are of the site in a manner that minimizes <br />the development of conditions that could lead to objectionable odors. <br />A. Aeration <br />8/27/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.