Laserfiche WebLink
0 0 Page 7 of 18 <br />activities. However, there is ample storage space available in the event operations <br />have to temporarily cease due to adverse weather conditions. <br />J. Utility Service Interruptions <br />All equipment is powered by diesel engines and 550 -gallon fuel storage tank is <br />maintained on-site. <br />iOTMOMMIM, M, <br />The primary sources pf odors from this activity may occur during the screening process <br />and when loading the product that is being shipped to market, in particular with the mulch. <br />If stockpiled for an extended period of time, the mulch products may result in an <br />anaerobic condition and create objectionable odors. As a result, the contractor works <br />diligently to remove the mulch products from the site within 90 days of processing and <br />other chipped and ground material within 90 days of processing. The operator plans to <br />manage all compostable material handling are of the site in a manner that minimizes <br />the development of conditions that could lead to objectionable odors. <br />A. Aeration <br />8/27/2003 <br />