Laserfiche WebLink
Page 9 of 18 <br />E. Pad Maintenance <br />Site personnel routinely inspect the pad for any evidence of ponding or drainage <br />problems. Any standing water that is discovered will be absorbed with chipped material <br />and the depression will be filled with soil. <br />F. Wastewater Pond Controls <br />All storm water/waste water is conveyed to the designated drainage channel and <br />sampled in accordance with the landfill's waste discharge requirements/monitoring and <br />G. Storage Practices <br />1. Storage Time <br />a. Feedstock <br />Feedstock will be processed within 7 days of receipt (indicate the average <br />storage time/frequency of contractor to process material). Since most of the <br />feedstock received is a woody material, longer storage times have not posed <br />any odor problems. <br />