Laserfiche WebLink
is Page 10 of 18 <br />b. Processed Material <br />Material that is not planned to be used on-site is removed from the site within120 <br />days of processing. Material planned to be used on-site as ADC or erosion <br />control will be used within 120 of processing. <br />2. Pile Geometry <br />a. <br />Feedstock <br />Provide the number and dimension of each pile. <br />b. Processed Material <br />Provide the number and dimension of each pile. <br />1. Equipment <br />the contractor's equipment fleet or rented from a local company. in addition, <br />equipment and operators from the landfill are available in the event of an <br />emergency. <br />8/27/2003 <br />