Laserfiche WebLink
0, Page 13 of 18 <br />Order generated after Increase turning frequency, <br />turning check temperatures, add <br />bulking agent <br />Curing Piles High temperatures in Decrease pile size, <br />windrow increase windrow <br />time prior to moving <br />Retention Basin Standing water overloaded Install filter berm <br />before <br />with nutrients or sediment enlarge pond size, <br />apply <br />excess water to <br />cropland <br />Material Removal Process <br />Once it has been determined that removing on-site material is necessary, operator <br />Will begin removing the material deemed the source of the odor (most likely curbside <br />Green waste) from the site. Operator will remove at least 5 percent of the offending <br />material daily until the odors are no longer detectable off-site as verified by the LEA <br />Assuming approximately 15,000 cubic yards of green waste on-site at any one time, <br />this means at least 750 cubic yards will be removed per day. <br />Resetting of Facility Capacity <br />8/27/2003 <br />