Laserfiche WebLink
Underground <br />Designated UST OperatorVisual inspection Report <br />.... . <br />_ <br />,iii„ .� T iNG AND MAIN ri ENANC: <br />Yes <br />No <br />NA <br />Bate last <br />performed <br />—.. _..._-_ ... - ....._ ..... <br />Has monitoring system certification been completed within the past <br />❑ <br />-9-23 <br />1.2 rr ontlis' <br />Has spill container testing leen completed within the pass: 12 <br />� <br />IJ <br />5-9-23 <br />n <br />❑ <br />Has overfill prevention equipment inspection been completed <br />5-17-21 <br />within the past '16 months? <br />k jas secoiida y contairin,eiat. e.'`.rt,ik3g heon c�,71tjpleted wit.hir) th . past <br />36 rnonths? <br />� <br />� <br />✓ <br />�� <br />Has tank tightness testing been completed within required <br />�� <br />❑ <br />tirraeframes�' <br />1 <br />( }} <br />Has line tightnews testing been completed within the i c,!g sired <br />timefrarries? <br />Other Test / Maintenance: ❑ ❑ ❑ <br />Other T est / iviaintonanc:e: ❑ ❑ ❑ <br />Other Test / Maintenance, I � ❑ ❑ <br />11. FACILITY EMPLOYEE TRAINING -17- 3 Yes No <br />i ,We. aril 111divid0ais per uciriing facility errita110yec� dUtie!, received Lhe ie-quired Wiiii:y <br />empinyee training within the pa„t 12 months'? <br />. COMMENTS <br />Phis section may be used to record comments or observations that are not current: compliance. <br />deficiencies. <br />A1! ortSwer d7?(x!”! et! "No," must be described by -the designated UST T operotor, in Section . <br />4 <br />