My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 8:34:06 PM
Creation date
5/1/2024 5:03:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231667
PE
2361 - UST FACILITY
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4075 E MAIN ST STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground <br />Designated UST OperatorVisual inspection Report <br />.... . <br />_ <br />,iii„ .� T iNG AND MAIN ri ENANC: <br />Yes <br />No <br />NA <br />Bate last <br />performed <br />—.. _..._-_ ... - ....._ ..... <br />Has monitoring system certification been completed within the past <br />❑ <br />-9-23 <br />1.2 rr ontlis' <br />Has spill container testing leen completed within the pass: 12 <br />� <br />IJ <br />5-9-23 <br />n <br />❑ <br />Has overfill prevention equipment inspection been completed <br />5-17-21 <br />within the past '16 months? <br />k jas secoiida y contairin,eiat. e.'`.rt,ik3g heon c�,71tjpleted wit.hir) th . past <br />36 rnonths? <br />� <br />� <br />✓ <br />�� <br />Has tank tightness testing been completed within required <br />�� <br />❑ <br />tirraeframes�' <br />1 <br />( }} <br />Has line tightnews testing been completed within the i c,!g sired <br />timefrarries? <br />Other Test / Maintenance: ❑ ❑ ❑ <br />Other T est / iviaintonanc:e: ❑ ❑ ❑ <br />Other Test / Maintenance, I � ❑ ❑ <br />11. FACILITY EMPLOYEE TRAINING -17- 3 Yes No <br />i ,We. aril 111divid0ais per uciriing facility errita110yec� dUtie!, received Lhe ie-quired Wiiii:y <br />empinyee training within the pa„t 12 months'? <br />. COMMENTS <br />Phis section may be used to record comments or observations that are not current: compliance. <br />deficiencies. <br />A1! ortSwer d7?(x!”! et! "No," must be described by -the designated UST T operotor, in Section . <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.